OEM Die Casting, Die Casting, Die Cast manufacturer / supplier in China, offering Aluminum Alloy Die Casting Machining Auto Spare Parts, OEM Castings Supplier Resin Coated Sand Mold Casting Aluminum Sand Casting, OEM Brass Casting Brass Pressure Die Casting and so on.
Purchase Qty. / Reference FOB Price | |
---|---|
1,000-4,999 Pieces | US $5.52 |
5,000+ Pieces | US $3.56 |
Port: | Qingdao, China
|
---|---|
Production Capacity: | 50000pieces/Month |
Payment Terms: | L/C, T/T, D/P, Western Union, Paypal, Money Gram |
Die Casting Machine Type: | Hot Chamber Die Casting Machine |
---|---|
Die Casting Method: | Precision Die Casting |
Application: | Auto Parts |
Machining: | CNC Machining |
Material: | Aluminum |
Surface Preparation: | Polishing |
Material | Aluminum Alloy ADC12 ,A380, Al 6061 |
Surface Treament | Anodising, powder coating, sand blasting, painting |
Part Weight | From 3g to 20kg |
Application | Industry fittings and Construction and Decoration. |
Casting Machine | 200-1200 tons |
Capability | Output 100 tons per month. |
New Moulds | Opening new mould about 30 days . |
Fabrication | Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs →QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service |
Deep Processing | CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling |
Certification | 1. ISO9001-2008/ISO 9001:2008; |
2. GB/T28001-2001(including all the standard of OHSAS18001:1999); | |
3. GB/T24001-2004/ISO 14001:2004; | |
4. GMC. | |
MOQ | As custimer's.Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ. |
Free Samples | YES |
Payment | 1. T/T: 50% deposite, the balance will be paid before delivery; |
2. L/C: the balance irrevocable L/C at sight. | |
Delivery Time | 1. Mould: 35-45 days |
2. Bulk Order: 30-40 days | |
OEM | Available. |
4.Inspection Process
In order to ensure the quality of the orders, our independent QC members to carry out strict inspection at each stage:
1.We have complete testing machine and equipment and professional quality inspectors.
2.Before mass production, we will carry out professional quality inspection, including dimension report,
material report, product main point inspection and other related reports.
3.During the sample production period, we will update the production status to the customers from
time to time every week to ensure real-time tracking of product production and keeping in touch with customers.
Q. How can I get the quotation?
A:Please send us information for quote: drawing, material, weight, quantity and request.
Q: If we don't have drawing, can you make drawing for me?
A:Yes, we make the drawing of your sample and duplicate the sample.
Q:When can I get the sample?
A: 25-30 days after you start to make mold. The accurate time depends on your product.
Q: What is your main order time?
A: 35-40 days after the payment. The accurate time depends on your product.
Q. What is your payment method?
A:Tooling: 100% TT advanced.
Main order: 50% deposit, balance 50% to be paid before shipment.
Q: Which kind of file format you can read?
A:PDF, ISGS, DWG, STEP, MAX..
Q:If you export to our country before, can I get the information of your import customer in our country?
A: We can't offer you all the information of our customer because we have duty to protect our customers' privacy. But we can provide you some part of B/L.